HR-ZOO project is establishing a network of five data centres located:
HR-ZOO OS - J. J. Strossmayer University of Osijek, University campus; HR-ZOO RI - University of Rijeka, University campus Trsat; HR-ZOO ST - University of Split, University campus Visoka; HR-ZOO ZG1 - University of Zagreb, University Computing Centre (SRCE); HR-ZOO ZG2 - University of Zagreb, University campus Borongaj.Reliable and modern data centres (DC) ensure high availability of ICT equipment and digital services within defined technical and security standards, achieved by installing a number of technical systems:
J. J. Strossmayer University of Osijek
University campus of Osijek
Gross area: 411 m2
Designed Power capacity of DC: 125 kW
Installed capacity of DG: 220 kVA
Output power capacity of UPS: 100 kVA
Cooling capacity: 100 kW
University of Split
University campus Visoka
Gross area: 379 m2
Designed Power capacity of DC: 125 kW
Installed capacity of DG: 220 kVA
Output power capacity of UPS: 100 kVA
Cooling capacity: 100 kW
University of Rijeka
University campus Trsat
Gross area: 213 m2
Designed Power capacity of DC: 125 kW
Installed capacity of DG: 220 kVA
Output power capacity of UPS: 100 kVA
Cooling capacity: 100 kW
University of Zagreb
University Computing Centre (SRCE)
Gross area: 359 m2
Designed Power capacity of DC: 350 kW
Installed capacity of DG: 2x400 kVA
Output power capacity of UPS: 2x160 kVA
Cooling capacity: 2x100 kW
University of Zagreb
University campus Borongaj
Gross area: 1.317 m2
Designed Power capacity of DC: 1.100 kW
Installed capacity of DG: 1.250 kVA
Output power capacity of UPS: 750 kVA
Cooling capacity: 500 kW
The HR-ZOO ZG2 data centre will be equipped with modern technical systems in accordance with the TIER 3 level which guarantees an annual minimum of 99.98% availability.
For more details visit DOCUMENTATION
Image source: Designed by starline / Freepik